Skip to Main Content
Market

Energy & Power Plant Construction

Reliable Construction Solutions for Critical Energy Infrastructure

Greystone Construction provides energy construction services that support the performance, safety, and reliability of power and utility infrastructure. Our team brings the experience, adaptability, and hands-on approach needed to successfully deliver energy and power-related projects. From facility upgrades and expansions to new construction, we work across a variety of building systems and project types—aligning each solution with your operational requirements, schedule, and budget. We understand the importance of minimizing downtime and maintaining continuity in active environments, and we’re ready to support your next project with a practical, solutions-driven approach.

Call us to discuss your energy + power plant construction project: 888-742-6837

Serving Energy Clients Across the United States

United States

1987 is the year Greystone was established

1987 is the year Greystone was established

1987 is the year Greystone was established

Our Energy & Power Plant Construction Services

Energy Facilities We Support

  • Power generation and plant support facilities
  • Substation and utility infrastructure buildings
  • Energy storage facilities
  • Control buildings and operations centers
  • Maintenance and equipment service facilities
  • Industrial energy and processing environments

Project Types

  • New construction for energy and power facilities
  • Plant expansions and capacity upgrades
  • Facility retrofits and infrastructure improvements
  • Equipment setting and heavy foundation work
  • Structural upgrades and reinforcements
  • Control room and operations space buildouts
  • Adaptive reuse of existing industrial facilities

Delivery Methods & More

  • General Construction
  • Design-Build Construction
  • Construction Management
  • Preconstruction Planning & Budgeting
  • Phasing & Occupied Facility Planning
  • Critical Path Scheduling
  • Value Engineering

RECENT PROJECTS

Koda Energy Plant Construction

Koda Energy Fuel Delivery System

The Koda Energy fuel delivery system project was a fast-track, general construction opportunity unique in nature because it was the result of an emergency plant shutdown due to an explosion. The project required the perfect combination of efficient construction, improved safety features, process redundancy and additional fire protection. Greystone’s own tradesmen performed the metal building installation. The resulting fuel delivery system was constructed in less than 4 months and is capable of feeding biomass material at 12,000 cubic feet/hour.

Great River Energy

Greystone Construction has partnered with Great River Energy (GRE) for more than 15 years on a wide range of projects that supports the reliable and safe operation of their waste-to-energy and resource recovery facilities. In the last 5 years, our collaboration has included projects of all sizes, from facility service work and tipping curb and floor repairs to pump house improvements and other critical maintenance efforts. In addition to service and repair projects, Greystone has delivered larger-scale construction solutions for GRE, including multiple pre-engineered metal buildings for shop buildings, dry storage, and ash storage loadout facilities. 

Great River Energy Steel Shop Building and Resource Recovery Facility

Our construction timeline was very aggressive...yet the project hit this milestone due to creative scheduling by Greystone. They made sure that no time or opportunity for progress was lost throughout the project duration. Greystone demonstrated acute attention to detail throughout the construction process and went above and beyond with the detail on the final punch list.

Stacy Cook, VP & General Manager, Koda Energy
Dem-Con Anaerobic Digester

Dem-Con Anaerobic Digester

We were proud to join Dem-Con and Kanadevia Inova for the groundbreaking of their Anaerobic Digester Project—an important step forward for sustainable waste management in our region.

When complete in 2027, residents’ food scraps and organics from metro-area counties will be sent to this facility to be turned into energy instead of waste. The anaerobic digester will process 75,000 tons per year of organics that would have otherwise gone to a landfill, producing renewable natural gas (RNG) and biochar through a unique public/private partnership.

New Prague West Energy Station

Greystone was honored to join the New Prague city officials and project partners to celebrate the groundbreaking of the New Prague West Energy Station.

Once complete, the facility will provide the City of New Prague with the ability to generate power locally when the grid goes down, helping ensure reliable electricity for residents, businesses, and essential services. Projects like this strengthen community infrastructure and help secure New Prague’s energy future for years to come.

New Prague Minnesota Power Plant Construction

Let's Get Started on your Energy and Power Plant Construction Project

Are you searching for an experienced construction partner who values quality, collaboration, and demonstrates integrity? We want to work with you. Together, we will bring your vision to life.

Call 888-742-6837

Or follow the button below to submit an inquiry via email.