Waste, Recycling & Biomass Storage Facilities

Dem-Con Metal Recycling Building - Shakopee, MN
Greystone completed two buildings for Dem-Con's metal recycling operations: a 12,000 SF precast building and 1,500 SF car processing building.

Dem-Con Materials Recovery Facility - Shakopee, MN
Dem-Con needed a new material recovery facility to process recycled materials. Greystone erected a 58,000 SF metal building complete with reception, breakroom, conference, restrooms, office, ten loading docks and processing area.

Ties 2 Biomass Storage Fabric Building
Ties 2 required a structure to store 3,200 tons of wood chips at its Superior, WI location. Greystone erected an engineered 80' x 240' Natural Light Fabric Structure on 6' above grade concrete pad and piers.

Biomass Storage Fabric Building - Shakopee, MN
Our client required a building with a storage capacity of 3,000 tons of wood chips. Greystone recommended a 100' x 208' Natural Light Fabric Structure with a clear span that would allow maximum maneuverability of machinery.

Koda Energy Fuel Delivery System & Biomass Energy Plant
Koda Energy was a fast-track general construction opportunity unique in nature because it was the result of an emergency plant shutdown due to an explosion. The project required the perfect combination of efficient construction, improved safety features, process redundancy and additional fire protection.

East Central Waste Transfer Station
East Central partnered with Greystone to furnish and install a 62' x 60' fabric building for use as a waste transfer station.

Koda Energy - Turnbines & Maintenance - Shakopee, MN
Greystone furnished and erected the turnbine generator and fuel feed mcc buildings, installed metal siding and roofing on balance of plant and has performed ongoing maintenance and repair work throughout the facility.