Industrial Construction Portfolio

View projects by category:

Manufacturing facilities >    Salt & sand storage shed barn >

Biomass & recycling facilities >    Oil, gas & energy construction >

Warehousing & shops >    Vehicle & aircraft >

Food processing >

 

View all industrial construction projects:

180' x 288' and 180' x 324' Bulk Salt Storage Buildings | Port of Mobile, Alabama

Our crew at the port in Mobile, Alabama has done an impressive job installing not one, but two massive bulk salt storage buildings. The first completed building is 180’ x 288’. The second is 180’ x 324’ and took the five-person crew and two crane operators only two-and-a-half days to stand all the steel trusses. They are currently placing the fabric cover.

Vickerman Companies Warehousing & Distribution Facility | Norwood Young America, MN

Since 2012, Vickerman Company has partnered with Greystone to expand their warehouse space to 140,000 SF through multiple building additions. We are now adding an additional 122,000 SF of warehousing that will connect to the existing complex allowing the owners to travel with their lift equipment throughout the entire 262,000 SF.

Salt Storage Dome Building in Savage, MN

130' x 304' Salt Storage Dome Building | Savage, MN

Greystone furnished and installed a Natural Light Fabric Structure building on concrete piers for Cargill Deicing Technology to store 35,000 tons of deicing salt.

Exterior of Bismarck, ND airport carwash

Bismarck Airport Carwash - Bismarck, ND

This facility is under construction. This pre-cast concrete building will have a new car wash, fueling station and expanded parking for rental cars.

Salt storage shed / dome built by Greystone Construction in Fargo, ND

100' x 128' Salt Storage Shed / Dome | Fargo, ND

The city of Fargo, ND hired Greystone to furnish and install a 100' x 128' Natural Light Fabric Structure on 4' concrete piers with bunker panels.

Exterior view of the Oxygen Service Company office and warehouse addition

Oxygen Service Company Office & Warehouse Addition - St. Paul, MN

This two-story addition is 15,000 SF and includes offices, conference room, retail space, warehouse, and manufacturing area.

Exterior of Rahr Malting Pilot Brewery & Technical Center

Rahr Malting Pilot Brewery & Technical Center

Greystone Construction built Rahr's new 20,000 SF in Shakopee, Minnesota. The first floor houdrd a pilot brewing and micro-malting center, and the second floor houses an expanded malt quality control lab.

Exterior view of Dem-Con metal recycling building

Dem-Con Metal Recycling Building - Shakopee, MN

Greystone completed two buildings for Dem-Con's metal recycling operations: a 12,000 SF precast building and 1,500 SF car processing building.

Front view of Dem-Con recycling metal building

Dem-Con Materials Recovery Facility - Shakopee, MN

Dem-Con needed a new material recovery facility to process recycled materials. Greystone erected a 58,000 SF metal building complete with reception, breakroom, conference, restrooms, office, ten loading docks and processing area.

100' x 160' Salt & Sand Storage Shed / Barn - St. Louis County, MN

St. Louis County of Minnesota required a 100' x 160' fabric building shed to keep its deicing salt and sand dry. Greystone erected an engineered Natural Light Fabric Structure to meet their needs.